Skip to content
Booking yard visits and design walk-throughs for the building season.
Monday – Friday: 7:30 a.m. – 5 p.m.Residential and Small Commercial Contractor · UT License # 000000

Build window

The year, from drawing to dusk photos

Deck season along the Wasatch Front is short, and the work before it is long. Here is where each step usually falls.

  • Yard visits and design

    Evening visits start as the days lengthen and carry through winter.

    Oct–Mar

  • Drawings and written scope

    Anqi draws and writes while you decide.

    Nov–Mar

  • Permit and review

    Plans go to your city or county. Review times vary.

    Jan–Apr

  • Material orders

    Composite and railing systems can take weeks to arrive.

    Jan–Apr

  • Footings

    The ground has to be workable and the inspector has to look before concrete is covered.

    Mar–Jun

  • Framing

    Posts, beams and joists.

    Apr–Jul

  • Decking, railings and roofs

    The visible surface.

    May–Sep

  • Lighting and the dusk photos

    Lights go on and we photograph the work at dusk.

    Jun–Oct

  • Staining and sealing

    Wood decks get their finish while the boards are dry and before the first snow.

    Sep–Oct

Sample content.

Dates move with the weather and with how long your permit office takes.

How the window works

Crews can only be in so many yards at once, and the building months are the same for everyone. A yard visited in winter gets a place in the spring queue, and a yard visited in June may build in the fall.

We tell you where you stand at the end of the visit, and we say it again when the permit comes back. If a date moves, you hear it from Nolan, not from the crew.

What you can do in winter

  • Book an evening yard visit
  • Choose a material from sample boards
  • Sign the scope and let us file the permit
  • Pick lights and a railing style

Find your place in the year

Tell us what you are picturing and which months you want it done by.