Skip to content
Booking yard visits and design walk-throughs for the building season.
Monday – Friday: 7:30 a.m. – 5 p.m. · Tue and Thu evenings: By appointment · Saturday: Closed · Sunday: ClosedMonday – Friday: 7:30 a.m. – 5 p.m.Residential and Small Commercial Contractor · UT License # 000000(801) 555-0103

Railings and stairs

A railing is the part of a deck people lean on, so it is the part inspectors look at hardest. We build guards, handrails and stairs that pass, and that suit the view you want to keep.

A railing on a deck we did not build gets an inspection of the frame it hangs on, because a guard is only as good as what it is fixed to.

What is included

  • Guards and handrails in wood, metal or cable

  • Stairs with even risers and sound stringers

  • Posts anchored into the frame, not just bolted to the boards

  • Lighting set into posts or treads where you want it

Two black folding chairs and a small table on a wooden deck with cable railings under a timber pergola

The price

What changes the cost

We print no average, because yards differ. These are the things that move the number.

  • Railing style

    Wood balusters, metal and cable each have different material and labor costs.

  • Length and corners

    More runs and more corners mean more posts.

  • Stairs

    Height off the ground sets the number of steps, and wide stairs cost more.

  • What it is fixed to

    A weak frame has to be strengthened before a guard can hold.

  • Lighting

    Lights in treads and posts add wiring and a licensed electrician.

The work

The work, in order

  1. 01

    Step 1: Measure and mark

    We measure the runs and check how the posts will anchor.

  2. 02

    Step 2: Submit and order

    Rail kits and custom parts take time, so the order goes in early.

  3. 03

    Step 3: Posts first

    Posts are fixed and tested before anything hangs from them.

  4. 04

    Step 4: Rails, balusters and stairs

    The guard, the handrail and the treads go in.

  5. 05

    Step 5: The final evening

    We return at dusk to check that the lights do not glare.

Permits and rules

Guards generally are required where a walking surface is more than 30 inches above the ground, and stairs have rules for the height of risers and the grip of rails. Your building department sets them for your address.

We build to those rules and do not build anything the inspector would fail.

Questions about this work

Can I have cable railing?

Yes. Cable is allowed in most places, but the spacing and tension are inspected.

Can you add a handrail to old stairs?

Usually. We check the stringers first.

Will a railing block my view?

Cable and glass keep more of the view; we show you samples at the visit.

Do I need an inspection?

If the work needs a permit, yes. We schedule it.

Plan the railing

Tell us about the yard and the hour you would use it. We write back about a visit.